{"id":13549,"date":"2018-11-05T14:07:44","date_gmt":"2018-11-05T14:07:44","guid":{"rendered":"https:\/\/ewnews.co.uk\/?p=13549"},"modified":"2018-11-05T14:07:44","modified_gmt":"2018-11-05T14:07:44","slug":"wieland-makes-a-connection-at-the-reflector-building","status":"publish","type":"post","link":"https:\/\/ewnews.co.uk\/index.php\/wieland-makes-a-connection-at-the-reflector-building\/","title":{"rendered":"Wieland makes a connection at The Reflector building"},"content":{"rendered":"<p><a href=\"https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-13546 alignright\" src=\"https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4-300x193.jpg\" alt=\"\" width=\"300\" height=\"193\" srcset=\"https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4-300x193.jpg 300w, https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4-150x97.jpg 150w, https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4-768x494.jpg 768w, https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4.jpg 1024w, https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4-500x322.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>A modular wiring system and connectors from Wieland Electric are integral components in the new Reflector building, a landmark office and residential development on Dublin\u2019s Grand Canal Dock.<\/p>\n<p>The Reflector, owned by Park Developments Group, is a six-storey over basement building that extends to over 123,000sq ft and has been completed to the highest of standards that include LEED Gold V4 accreditation and A3 BER Certification.<\/p>\n<p>The facility has an impressive water frontage, spanning over 75m of Hannover Quay and has extensive views of the inner dock in Dublin\u2019s central business district.<\/p>\n<p>Working alongside the consultant engineer, Ethos Engineering, and the installer, Winthrop Engineering, Core Electrical Ltd designed and locally supplied the unique modular wiring system for the project, integrating an intelligent, modular lighting control system to fulfil the requirements of the brief.<\/p>\n<p>Core, Wieland\u2019s exclusive distributor for building installation products across Ireland, utilised Wieland wiring systems to provide a fast, hassle-free installation that would reduce installation costs and future-proof the building. Wieland modular wiring and connection systems offer maximum performance and reliability, providing a fast, secure and flexible installation, meeting todays\u2019 stringent requirements. Its inherent flexibility also means that any changes to the system can be accommodated quickly should the layout change at a later stage.<\/p>\n<p>Structured wiring with \u2018plug and play\u2019 connectivity, supplied pre-tested and pre-assembled off site for easy connection, has been shown to generate savings of 70% in installation time resulting in a significant savings.<\/p>\n<p>When this data is analysed intelligently, by considering the slightly higher capital costs of structured wiring compared to traditional wiring, there is still typically an average 30% saving on final installed cost.<\/p>\n<p>The modular wiring and lighting control system at The Reflector has provided a solution that reaches the environmental and user comfort objectives of today\u2019s modern office facilities to offer convenience, performance and future proofing in one touch.<\/p>\n<p><a href=\"https:\/\/www.wieland-electric.com\/en-gb\" target=\"_blank\" rel=\"noopener\">www.wieland.co.uk<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A modular wiring system and connectors from Wieland Electric are integral components in the new Reflector building, a landmark office and residential development on Dublin\u2019s Grand Canal Dock. The Reflector, owned by Park Developments Group, is a six-storey over basement building that extends to over 123,000sq ft and has been completed to the highest of [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":13546,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[609],"tags":[],"class_list":["post-13549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-installation-news","et-has-post-format-content","et_post_format-et-post-format-standard"],"jetpack_featured_media_url":"https:\/\/ewnews.co.uk\/wp-content\/uploads\/wieland-4.jpg","_links":{"self":[{"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/13549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=13549"}],"version-history":[{"count":1,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/13549\/revisions"}],"predecessor-version":[{"id":13550,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/13549\/revisions\/13550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/media\/13546"}],"wp:attachment":[{"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=13549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=13549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ewnews.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=13549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}