image1Luceco has supplied energy efficient LED lighting to C S Ellis Logistic Centres located throughout the West Midlands.

Electrical Contractors, EBM Electrical Services Ltd, have installed Lucecoโ€™s High Bay LED luminaires at C S Ellisโ€™s head office and distribution centre in South Luffenham.

The Titan High Bay provides an ideal replacement to HID 250W โ€“ 400W luminaires, offering high efficacy and over 50,000 hours of maintenance free operation. Other installations included LuxPack LED battens โ€“ a surface mounted luminaire available in 4ft, 5ft and 6ft lengths. Providing instant, cost effective lighting, the LuxPack offers up to 30,000 hoursโ€™ working life with no maintenance or re-lamping required, benefiting the environment in terms of energy efficiency and no lamp disposal.

Over the past 80 years, C S Ellis has gained an unrivalled wealth of industry experience, continually striving to be a leading โ€œOne Stop Logistics Providerโ€ by offering intelligent solutions using the latest technology that represents exceptional value.

Sharing the same objectives, Luceco has provided a lighting solution using the latest LED technology which also represents good value in terms of being an energy efficient, durable and safe, cost effective method of lighting the C S Ellis Logistic Centres throughout the West Midlands.

Lucecoโ€™s reputation is based on the reliability and functionality of its innovative products. By offering market leading guarantees and warranties, technical support, dedicated customer service and marketing backup, Luceco aims to make it easy for customers to specify and install sustainable lighting.

The teams behind Luceco have over 100 yearsโ€™ combined lighting industry experience gained over disciplines such as product design, development, testing and product management.

http://www.luceco.com/uk